Inside the facility
A Siemens-controlled facility built for repeatable output
Established in 2012, Jiuling's Zhenjiang, Jiangsu facility runs three workshops and four automated production lines, with up to 300,000 tons of annual capacity.
03
Workshops
04
Automated production lines
0 t260 t
Daily output
0 days15 days
Standard lead time

Production process
From raw material to dispatch
- Step 01
Raw material intake
Cement, aggregates, and polymer additives are received and staged by workshop, with batch records kept for traceability.
- Step 02
Automated batching
Formulation recipes are loaded into the Siemens control system, which meters raw materials by weight for each production run.
- Step 03
Siemens-controlled mixing
Four automated lines mix each batch under continuous process monitoring, keeping formulation parameters consistent across runs.
- Step 04
Packaging & dispatch
Finished product is packed in 20–40 kg bags according to product specification, then staged for coordinated dispatch.

Weigang Subdistrict, Runzhou District, Zhenjiang, Jiangsu, China